DURELLA - WATER DISTRIBUTION PLAN (stage 1).

Currently on "Durella" cattle do not utilise the entire property due to having to walk long distances to waters.  Natural resources surrounding watering points have been used too heavily by stock, leaving erosion, poor grass recovery, and reduction in soil health and biomass.  By spreading waters every 3km (as per our pipe plan) cattle will utilise the natural resources more evenly. The innovative system design will provide us with an enhanced  ability to supplement our livestock, via a gravity-fed, property-wide watering system. The new system will deliver  8 waters across 5 paddocks under stage 1, (see attached diagram), facilitating rotational grazing. The Project budget allocation is $11 000.00 (incl. GST).

 

Enquire

Files for downloading

External Link

Sorry: no external link provided

 

Queensland Government

RLF Programme

National Landcare Programme